A granny flat is not an extension lead through the garden. It needs a designed supply, protection, smoke alarms to Victorian rules, and paperwork. We will not connect a cabin to a powerpoint in the laundry.
The short version
- A granny flat needs a designed supply, not an extension lead through the garden.
- The two paths are a sub-board fed from the main house, or a separate meter and network connection. Each has trade-offs.
- Load decides everything: a studio with a split system and induction is a different job from a bedsit with a bar fridge.
- Underground cable, safety switches, smoke alarms and a Certificate of Electrical Safety are all part of the price.
- We will not connect a cabin to a powerpoint in the laundry.
Know what you are building first
In Victoria a small second dwelling or a “dependent person’s unit” has planning and building rules that your designer or surveyor handles. The electrician comes in once the footprint, kitchen and heating plan are known. Please tell us the following up front: floor area, whether it will be rented, what appliances are planned (reverse-cycle split, induction cooktop, electric hot water or heat pump, EV charger), and where the existing main switchboard sits relative to the flat.
Those answers drive the cable size, the trench length and whether the existing house supply can carry the extra demand. See home electrical load calculation for how we think about it.
Sub-board vs separate meter
Sub-board fed from the house. We run a submain from the main switchboard (or a dedicated breaker) in conduit to a sub-board in the flat. The flat has its own safety switches and circuit breakers. You pay one electricity account. This is usually the cheaper route when the house supply has headroom and the owner will live in or manage both.
Separate meter. If the flat will be let to someone who needs their own bill, or the house supply is already at its limit, you may need a new connection point and meter. Your electrician lodges the service request with the network distributor, and the retailer arranges the meter. Lead times vary, and the network may require upgrades at the pole or pillar. Ask early: this is the longest part of the timeline.
Load
Add up what will run together. A reverse-cycle split, a cooktop, a heat pump hot water system and an EV charger can pass the capacity of an older single-phase 63 A service. A house still on an old 32 A service with ceramic fuses is a switchboard upgrade before anything else. Related: switchboard upgrade guide, three-phase vs single-phase.
Trenching and cable
Underground cable between buildings is run in conduit at the depth set by the wiring rules, with warning tape above it and a clear path away from trees, driveways and the future pool. Concrete cutting, boring under paths and reinstating lawn are part of the cost. If you plan a deck, garage slab or retaining wall later, tell us now so the conduit goes where it will stay protected.
What goes in the flat
- A sub-board with RCD protection on every final circuit that needs it.
- Separate circuits for lights, powerpoints, an oven or cooktop, the air conditioner and hot water.
- Smoke alarms to current Victorian requirements, interconnected where required. See smoke alarm laws in Victoria.
- An exhaust fan in the bathroom, vented outside, on its own switched circuit.
- Outdoor lighting to the entry, which doubles as a safe path at night.
What we will not do
We will not connect a flat by running a heavy-duty extension lead from the house, plug a caravan lead into a laundry powerpoint, or sign off an unlicensed trench. We will not energise a flat without safety switches, and we will not leave smoke alarms “for later”. The certificate at the end records what was installed and tested, and your insurer and building surveyor will ask for it.
Cost guide for 2026
Guides only. Trench length, cable size and network charges swing the total.
- Sub-board plus submain for a small flat, short trench: commonly from a few thousand dollars.
- Longer runs, concrete cutting or a switchboard upgrade at the house: add a few thousand more.
- Fit-out electrics for a studio (lights, powerpoints, split circuit, smoke alarms): quoted per point, similar to a small renovation.
- New meter and network connection: the distributor and retailer charges are separate from our quote and can be significant.
Sequence on a typical job
First, a site visit to measure the distance from the main board and check its capacity and condition. Second, a written scope with the route, cable size and the choice between a sub-board and a separate meter. Third, if the board needs upgrading, that happens first so the new supply is protected. Fourth, trenching and conduit while the site is open. Fifth, rough-in cabling after the frame is up and before the lining goes on. Sixth, fit-off, testing and smoke alarms once the kitchen and bathroom are in. Last, the certificate and, for a new meter, the network and retailer steps.
Bring us in at the slab or frame stage, not at lock-up. A missed conduit under a slab is the most expensive electrical mistake on a small build. Rewire timing for the main house is covered in rewiring an old Melbourne home.
FAQ
- Can I use an existing shed circuit?
- Only if it was installed for that load, has the right protection, and the cable size matches. Most shed circuits were built for a drill and a light, not a bedroom.
- Do you handle underground mains in the yard?
- Yes. We design the route, run conduit and cable, and test before it is energised. Digging is done by us or a trench contractor you choose.
- Is three-phase required?
- Not for most granny flats. Single-phase is typical unless you are adding large motors or a big EV charger.
- Who books inspection?
- We lodge the electrical paperwork. The building surveyor handles the building side, and we make the electrical part ready for them.
- Growth suburbs?
- Wyndham, Casey and Melton see long network wait times for new connections. Established suburbs like Brunswick, Preston and Doncaster usually have spare capacity but tight trench routes.
- Can I run it from solar?
- You can share the house solar through a sub-board. An off-grid arrangement is a different project with batteries and an inverter design.
Related reading
See electrical, switchboard and safety switch upgrades, new build electrical stages, electrician in Craigieburn and electrician in Frankston.
Planning a granny flat?
Tell us the footprint, appliances and board location. We quote a proper supply. Call 1300 24 11 47.